Oversized and heavy-lift equipment  31.12.2012 19:30

The scheme of handling and installation on the foundation of gas turbine with weight 320 tons.
The scheme of mill handling weighing 150 tons.
On the photos is presented handling and installation of cargoes from 30 to 320 tons.